Governor Overhaul Process
- Governor is received, paperwork packet is opened and will follow
the component through out the servicing.
- The governor is then disassembled
and cleaned.
- Components are inspected by our certified Level 2 inspectors,
using magnetic particle and liquid penetrant procedures.
- Components are then dimensionally checked to verify they meet
the manufactures specifications.
- The governor is then reassembled. High and low RPM is set for
the aircraft using a calibrated test stand.
- Governor is now ready for installation and rigging on the aircraft.